Thursday 17 November 2016

Production meeting 1


In our first productions meeting, we were looking looking through our storyboard, other planing documents and ideas to see what should be our first plan of action. We was making sure our schedule to film was still accurate was Shelby works and Sarah has a project our of class to attend so this meant that our schedule was very busy so we needed to make sure that all the dates discussed where still a good time and available. We also were contacting friends to make sure they were available for the days which we went to film the cool kid scenes. We realised that sometimes Sarah was not available so me and shelby put some dates together so we could film the footage where Sarah would not be present.

After this we then planned who would have which roles. Sarah brought the costumes for herself and Shelby, Shelby brought the camera and her makeup, I brought the tripod and managed our friends like where to meet and their costumes.

During this first meeting we also discussed what footage we should film and in which locations. Therefore we looked at our storyboard and through our ideas to see if everything was ok and if we should plan to film extra footage elsewhere. We decided to add some more singing shots like the dolly shots. We then picked all the locations in which we could film; we debated which shopping centre to go too as Romford is more local but smaller and more crowded whereas Lakeside is further away but more quite and cleaner. We decided to go to Lakeside as the footage would look better. When filming the school scenes we also discussed which school to film in so we decided to film at both Eastbrook and Robert Clack so we could utilise both resources and all their different settings.

We then finished this meeting and decided to disuse the rest on our issues and planning then.


No comments:

Post a Comment